Chronotopicâ„¢ System : Scale-Up Study of the Manufacturing Process in Bottom-Spray Fluid Bed Equipment
Other Research Product
Publication Date:
2008
Citation:
Chronotopicâ„¢ System : Scale-Up Study of the Manufacturing Process in Bottom-Spray Fluid Bed Equipment / M. Cerea, L. Palugan, A. Grave, M. Legora, N. Poellinger, A. Gazzaniga. ((Intervento presentato al 6. convegno World Meeting on Pharmaceutics, Biopharmaceutics and Pharmaceutical Technology tenutosi a Barcellona nel 2008.
IRIS type:
14 - Intervento a convegno non pubblicato
List of contributors:
M. Cerea, L. Palugan, A. Grave, M. Legora, N. Poellinger, A. Gazzaniga
Link to information sheet: